COMPLETED COMMERCIAL PROJECTS
BOSCH HQ SHOWROOM CLAYTON - YARRA VALLEY COMMERCIAL
An office space converted into a fully operational appliance showroom, tool display and high end meeting spaces
​
This elegant space has been fit out with the top of the range finishing, including R&M certified cat6a data, KNX lighting control and automation, and clevertronics zoneworks remote monitoring
MARYMEDE MATERIALS TECH BUILDING - ASCOT GROUP
A new project from the ground up. Preliminary works included 100m of tenching from schools substation MSB to new site Sub board basement location, Run in fibre optic lead in to Basement LAN cabinet to connect to schools network.
​
All fit out works of two level and basement building. Ground floor incorporated wood work classroom and all equipment and safety wiring, Upstairs consisting of offices and classrooms. Data network installed on a cat6a certified system. installation of moduline ducting for power and data.
PEGS CHANGEROOMS ,KEILOR PARK - ASCOT GROUP
Another new build project from the ground up.
​
Preliminary works included a full services site scan, redirecting of any services passing through new site location, trenching from site MSB to new site location. Full internal fitout of changerooms, toilets, shower areas and store room areas. External landscape feature lighting on building and in garden beds